arrow_back All Products
bolt BossHQ Factory

Optimize Your Manufacturing Processes with AI

Detect bottlenecks, boost machine efficiency, verify cost estimates — with real-time AI analytics.

Request Demo arrow_forward
%98.4
OEE Target
%23
Cost Reduction
Gerçek Zaman
Data Stream
<5dk
Anomaly Detection

Make Your Factory Smarter

Production becomes visible at every stage

event_available

Production Planning

Automatic plan suggestions based on capacity, shift, and order data.

warning

Bottleneck Detection

Which line, which machine is slowing production — real-time visibility.

timer

Duration Estimation

Production time estimation based on historical data, 95% accuracy.

price_check

Cost Analysis

Calculate labor, material, energy costs on a per-order basis.

health_and_safety

Anomaly Alerts

Detect abnormal parameters and warn before a breakdown occurs.

dashboard

OEE Dashboard

Monitor availability, performance, and quality metrics on one screen.

How Does It Integrate?

No additional hardware required for your existing SCADA / MES system

1

Data Connection

Connect to your PLC, SCADA, or MES system via API / OPC-UA.

2

Baseline Is Established

AI learns the production rhythm in the first 2 weeks and sets anomaly thresholds.

3

Alerts Arrive

Instant notifications for bottlenecks, anomalies, or capacity overruns.

4

Reports & Suggestions

Weekly OEE reports and improvement suggestions are delivered automatically.

OEE & Efficiency

See the Loss with Real-Time OEE Tracking

BossHQ Factory monitors each machine's Availability, Performance, and Quality values in real time and automatically calculates the OEE score.

Detect exactly where the loss occurs with shift-based, machine-based, or product-based drilldown.

Who Benefits and How?

Data-driven decision making across the factory

engineering Production Management

Factory Manager

Monitor OEE daily, set shift targets with real data.

build Maintenance

Maintenance Team

Transition from reactive to proactive maintenance with failure predictions.

inventory Planning

Production Planning

Order-based capacity planning, early warning before delays.

account_balance Finance

CFO / Cost Control

Order-based actual cost vs. budget comparison.

verified Quality

Quality Manager

Monitor rejection rates in real time, accelerate root cause analysis.

local_shipping Logistics

Shipping Planning

Plan deliveries based on production completion estimates.

format_quote

"With BossHQ Factory we were able to see our bottlenecks. We increased our OEE by 12 points in the first 3 months."

Kemal Arslan
Factory Manager, Logistix Production

Frequently Asked Questions

Does it work without a SCADA system? expand_more
Yes. It can read data directly from PLC or work with CSV/Excel import.
How long does integration take? expand_more
Standard SCADA integration is 1-2 weeks. MES integration is 3-4 weeks.
Which sectors is it suitable for? expand_more
Food, textile, metalworking, automotive supply, chemicals — any manufacturing sector.
Is real-time data required? expand_more
No. It also works with batch data transfer, but real-time provides higher value.
Do I have to replace my existing MES? expand_more
No. BossHQ Factory is installed as a layer on top of your existing system.

Ready to Integrate AI Into Your Business?

Our team will analyze your system and offer a tailored roadmap.

Request Free Analysis arrow_forward